Inverse Definite Overcurrent Relay Response at Pencawang Masuk Utama Pagoh, Johor
DOI:
https://doi.org/10.54554/ijeeas.2024.7.02.001Abstract
This paper focuses on modelling 132/11kV Pencawang Masuk Utama (PMU) Pagoh, Johor for assessing the Inverse Definite Minimum Time (IDMT) overcurrent relay in terms of relay response time using PSCAD software and comparing them with the calculated value. The relay is subjected to various fault conditions such as three phase fault, double phase and single-phase faults at different points of the network to observe the operating time. To ensure the reliability of the overcurrent relay, the response time was analysed. The response time were then being verified accordingly and the simulation result shows that the relay response time closely match the calculated value.
Downloads
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).